Capital · deployed
~$50B/yr capex actually spent (TTM TWD 1,491,123M at 30) climbing toward $60-64B FY2026 guidance; AZ/JP/DE fab buildouts; + CHIPS $6.6B grant + up to $5B loans
Sourced figures 2
- stockanalysis.com TSM cash-flow statement capex TTM TWD 1,491,123M (~$50B); FY2025 TWD 1,272,411M
- Wikipedia — TSMC (CHIPS Act award) Commerce finalized binding US$6.6B CHIPS grant (Nov-2024) + up to US$5B proposed loans
the working
Threads 1
A claim is one metric we assert about a node — the value is the summary, this page is the receipt. Sourced from kestrel; supersedes-history not yet shown. Back to TSMC.
