Tracked inflow · AEP Ohio (Green Chapel Station substation)
$95.0M tracked across 1 claim(s)
Sum of point-figure, USD-denominated flow claims tagged Tracked inflow · AEP Ohio (Green Chapel Station substation) in the Q1 money-flow map.
Aggregate of 1 member claims — each member's sourced figures are below.
the working
Basis
Sum of point-figure, USD-denominated flow claims tagged Tracked inflow · AEP Ohio (Green Chapel Station substation) in the Q1 money-flow map.
The pieces 1
| Flow | As of | Amount |
|---|---|---|
| Intel (foundry construction (fab capex — Foundry/IFS division)) → AEP Ohio (Green Chapel Station substation) | $95.0M | |
| Total (settled figures only) | $95.0M | |
Threads 0
No thread tagged to this actor yet.
A claim is one metric we assert about a node — the value is the summary, this page is the receipt. Sourced from kestrel; supersedes-history not yet shown. Back to Research · Q1.