Tracked inflow · Hung Ching Construction
$163.4M tracked across 1 claim(s)
Sum of point-figure, USD-denominated flow claims tagged Tracked inflow · Hung Ching Construction in the Q1 money-flow map.
Aggregate of 1 member claims — each member's sourced figures are below.
the working
Basis
Sum of point-figure, USD-denominated flow claims tagged Tracked inflow · Hung Ching Construction in the Q1 money-flow map.
The pieces 1
| Flow | As of | Amount |
|---|---|---|
| ASE Technology (advanced packaging/test capacity construction (LEAP program)) → Hung Ching Construction | $163.4M | |
| Total (settled figures only) | $163.4M | |
Threads 0
No thread tagged to this actor yet.
A claim is one metric we assert about a node — the value is the summary, this page is the receipt. Sourced from kestrel; supersedes-history not yet shown. Back to Research · Q1.
