The Projection — a symmetric watercolor butterfly

The Projection

The surface is never the system.

← Research · Q1

Tracked inflow · Turner Construction Company (EPC/general-contractor services (seller side))

$2.0B tracked across 1 claim(s) (+3 more without a settled point figure — see members)

about Turner construction company

Sum of point-figure, USD-denominated flow claims tagged Tracked inflow · Turner Construction Company (EPC/general-contractor services (seller side)) in the Q1 money-flow map.

Aggregate of 4 member claims — each member's sourced figures are below.


the working

Basis

Sum of point-figure, USD-denominated flow claims tagged Tracked inflow · Turner Construction Company (EPC/general-contractor services (seller side)) in the Q1 money-flow map.

Threads 0

No thread tagged to this actor yet.

A claim is one metric we assert about a node — the value is the summary, this page is the receipt. Sourced from kestrel; supersedes-history not yet shown. Back to Research · Q1.