Tracked inflow · Turner Construction
$2.0B tracked across 1 claim(s) (+3 more without a settled point figure — see members)
Sum of point-figure, USD-denominated flow claims tagged Tracked inflow · Turner Construction in the money-flow graph, leaving out claims with no realization status (reported, not closed) and guarantees (contingent).
Aggregate of 4 member claims — each member's sourced figures are below.
the working
Basis
Sum of point-figure, USD-denominated flow claims tagged Tracked inflow · Turner Construction in the money-flow graph, leaving out claims with no realization status (reported, not closed) and guarantees (contingent).
The pieces 4
| Flow | As of | Amount |
|---|---|---|
| Vantage Data Centers → Turner Construction | 2024-11-04T00:00:00Z | $2.0B |
| CoreWeave → Turner Construction | not summed | |
| Meta → Turner Construction | not summed | |
| Vantage Data Centers → Turner Construction | not summed | |
| Total (settled figures only) | $2.0B | |
Threads 0
No thread tagged to this actor yet.
A claim is one metric we assert about a node — the value is the summary, this page is the receipt. Sourced from kestrel; supersedes-history not yet shown. Back to Research · Q1.