The Projection — a symmetric watercolor butterfly

The Projection

The surface is never the system.

← Research · Q1

TSMC → unnamed vendor(s) — land, shell & materials

$265.0B — Bloomberg reported on 1 October 2026 that TSMC has already committed to spending USD 265 billion at a site in Arizona where it is developing several fabrication plants. (paid to unnamed vendors/contractors — this source doesn't disclose who specifically got the money)

high confidence ·

$265.0B — Bloomberg reported on 1 October 2026 that TSMC has already committed to spending USD 265 billion at a site in Arizona where it is developing several fabrication plants. (paid to unnamed vendors/contractors — this source doesn't disclose who specifically got the money)

Sourced figures 1


the working

Basis

$265.0B — Bloomberg reported on 1 October 2026 that TSMC has already committed to spending USD 265 billion at a site in Arizona where it is developing several fabrication plants. (paid to unnamed vendors/contractors — this source doesn't disclose who specifically got the money)

A claim is one metric we assert about a node — the value is the summary, this page is the receipt. Sourced from kestrel; supersedes-history not yet shown. Back to Research · Q1.