The Projection — a symmetric watercolor butterfly

The Projection

The surface is never the system.

← Research · Q1

Softbank → SB Energy

$2.5B (estimate) — SB Energy's S-1 stated that the Cosmos Technology Campus lease, with an affiliate of SoftBank as tenant, has a 15-year initial term and expected aggregate rent of approximately USD 2.5 billion.

high confidence · about Sb energy

$2.5B (estimate) — SB Energy's S-1 stated that the Cosmos Technology Campus lease, with an affiliate of SoftBank as tenant, has a 15-year initial term and expected aggregate rent of approximately USD 2.5 billion.


the working

Basis

$2.5B (estimate) — SB Energy's S-1 stated that the Cosmos Technology Campus lease, with an affiliate of SoftBank as tenant, has a 15-year initial term and expected aggregate rent of approximately USD 2.5 billion.

Threads 1

A claim is one metric we assert about a node — the value is the summary, this page is the receipt. Sourced from kestrel; supersedes-history not yet shown. Back to Research · Q1.