$1.9B — Nscale's S-1 stated that in August 2026 Nscale Ward County Borrower SPV, LLC entered into a USD 1.85 billion delayed-draw term loan facility, made up of USD 630.0 million of fixed-rate and USD 1.22 billion of floating-rate delayed draw loan commitments (the Ward County GPU Facility). The S-1 does not name the lenders.
$1.9B — Nscale's S-1 stated that in August 2026 Nscale Ward County Borrower SPV, LLC entered into a USD 1.85 billion delayed-draw term loan facility, made up of USD 630.0 million of fixed-rate and USD 1.22 billion of floating-rate delayed draw loan commitments (the Ward County GPU Facility). The S-1 does not name the lenders.
Sourced figures 1
the working
Basis
$1.9B — Nscale's S-1 stated that in August 2026 Nscale Ward County Borrower SPV, LLC entered into a USD 1.85 billion delayed-draw term loan facility, made up of USD 630.0 million of fixed-rate and USD 1.22 billion of floating-rate delayed draw loan commitments (the Ward County GPU Facility). The S-1 does not name the lenders.
Threads 0
No thread tagged to this actor yet.
A claim is one metric we assert about a node — the value is the summary, this page is the receipt. Sourced from kestrel; supersedes-history not yet shown. Back to Research · Q1.
