Crusoe Energy Systems (Abilene, TX campus JV — initial formation) (real-estate/infrastructure JV equity (initial formation), 2024-10-15) → Crusoe Energy Systems (datacenter construction (Abilene, TX campus — builder/operator side))

$3.4B — $3.4B joint venture (fully funded forward takeout structure) — Lancium Clean Campus, Abilene TX, 206MW, two buildings, 100% long-term leased to a Fortune 100 hyperscale tenant

med confidence · as of 2024-10-15 · about Crusoe energy systems

$3.4B — $3.4B joint venture (fully funded forward takeout structure) — Lancium Clean Campus, Abilene TX, 206MW, two buildings, 100% long-term leased to a Fortune 100 hyperscale tenant

Sourced figures 1


the working

Basis

$3.4B — $3.4B joint venture (fully funded forward takeout structure) — Lancium Clean Campus, Abilene TX, 206MW, two buildings, 100% long-term leased to a Fortune 100 hyperscale tenant