Crusoe Energy Systems (Abilene, TX campus JV — initial formation) (real-estate/infrastructure JV equity (initial formation), 2024-10-15) → Crusoe
$3.4B — $3.4B joint venture (fully funded forward takeout structure) — Lancium Clean Campus, Abilene TX, 206MW, two buildings, 100% long-term leased to a Fortune 100 hyperscale tenant
$3.4B — $3.4B joint venture (fully funded forward takeout structure) — Lancium Clean Campus, Abilene TX, 206MW, two buildings, 100% long-term leased to a Fortune 100 hyperscale tenant
Sourced figures 1
the working
Basis
$3.4B — $3.4B joint venture (fully funded forward takeout structure) — Lancium Clean Campus, Abilene TX, 206MW, two buildings, 100% long-term leased to a Fortune 100 hyperscale tenant
Threads 0
No thread tagged to this actor yet.
A claim is one metric we assert about a node — the value is the summary, this page is the receipt. Sourced from kestrel; supersedes-history not yet shown. Back to Research · Q1.
