$20.0B — 210.5M shares at $95/share, upsized from an initial $15B announcement (08-10) to $20B on pricing (08-11); explicitly to fund the foundry buildout, stacked on top of the existing CHIPS Act government equity stake
$20.0B — 210.5M shares at $95/share, upsized from an initial $15B announcement (08-10) to $20B on pricing (08-11); explicitly to fund the foundry buildout, stacked on top of the existing CHIPS Act government equity stake
Sourced figures 1
the working
Basis
$20.0B — 210.5M shares at $95/share, upsized from an initial $15B announcement (08-10) to $20B on pricing (08-11); explicitly to fund the foundry buildout, stacked on top of the existing CHIPS Act government equity stake
Hypothesized recipients 3
- Intel → AEP Ohiohypothesis
$95.0M — AEP Ohio built a $95M, 500-megawatt substation ('Green Chapel Station') specifically for Intel's New Albany, Ohio fab; now sitting idle due to Intel's construction delay, with Meta separately seeking to draw power from it instead.
- Intel → Bechtel Corp.hypothesis
General contractor for Phase 1 of Intel's New Albany, Ohio fab -- 2.5M sq ft including 600,000 sq ft of cleanrooms; no dollar figure disclosed for Bechtel's own contract.
- Intel → Hoffman Construction Co.hypothesis
General contractor for Intel's Fab 52 and Fab 62 in Chandler, Arizona; Fab 52 (~$5B, 2.9M sq ft, project total not Hoffman-specific) was ENR's 2025 Project of the Year. Jacobs Engineering is the project designer.
A claim is one metric we assert about a node — the value is the summary, this page is the receipt. Sourced from kestrel; supersedes-history not yet shown. Back to Intel.