JPMorgan Chase → Crusoe
$2.3B — $2.3B construction loan for the same Abilene, TX campus (206MW)
$2.3B — $2.3B construction loan for the same Abilene, TX campus (206MW)
Sourced figures 1
the working
Basis
$2.3B — $2.3B construction loan for the same Abilene, TX campus (206MW)
Threads 0
No thread tagged to this actor yet.
A claim is one metric we assert about a node — the value is the summary, this page is the receipt. Sourced from kestrel; supersedes-history not yet shown. Back to Research · Q1.
