The Projection — a symmetric watercolor butterfly

The Projection

The surface is never the system.

← Research · Q1

Micron Technology → unnamed vendor(s) — memory & storage (HBM advanced-packaging facility construction)

$7.0B — SG$9.5B (~$7B) HBM advanced-packaging facility, through the end of the decade and beyond (paid to unnamed vendors/contractors — this source doesn't disclose who specifically got the money)

med confidence · as of 2025-01-08 ·

$7.0B — SG$9.5B (~$7B) HBM advanced-packaging facility, through the end of the decade and beyond (paid to unnamed vendors/contractors — this source doesn't disclose who specifically got the money)

Sourced figures 1


the working

Basis

$7.0B — SG$9.5B (~$7B) HBM advanced-packaging facility, through the end of the decade and beyond (paid to unnamed vendors/contractors — this source doesn't disclose who specifically got the money)

A claim is one metric we assert about a node — the value is the summary, this page is the receipt. Sourced from kestrel; supersedes-history not yet shown. Back to Research · Q1.