nVent Electric plc (capital (treasury/financing facet)) → Maverick Power (power distribution & infrastructure manufacturing (data center power equipment — McKinney, TX))

$550.0M (ceiling) — potential additional consideration of up to $550M in cash, contingent on Maverick Power achieving certain performance metrics in 2027 and 2028 — an earnout, not delivered consideration

med confidence · as of 2027-01-01 · about Maverick power

$550.0M (ceiling) — potential additional consideration of up to $550M in cash, contingent on Maverick Power achieving certain performance metrics in 2027 and 2028 — an earnout, not delivered consideration

Sourced figures 1


the working

Basis

$550.0M (ceiling) — potential additional consideration of up to $550M in cash, contingent on Maverick Power achieving certain performance metrics in 2027 and 2028 — an earnout, not delivered consideration

Threads 0