The Projection — a symmetric watercolor butterfly

The Projection

The surface is never the system.

← Research · Q1

SB Energy (datacenter operation (buyer side — Piketon, OH campus developer)) → AEP Ohio (American Electric Power) (grid interconnection / transmission infrastructure)

$4.2B — $4.2B new 765kV transmission line serving a planned ~10GW SB Energy datacenter campus in Piketon, OH

med confidence · as of 2025-01-01 · about Aep ohio american electric power

$4.2B — $4.2B new 765kV transmission line serving a planned ~10GW SB Energy datacenter campus in Piketon, OH

Sourced figures 1


the working

Basis

$4.2B — $4.2B new 765kV transmission line serving a planned ~10GW SB Energy datacenter campus in Piketon, OH

Threads 0

No thread tagged to this actor yet.

A claim is one metric we assert about a node — the value is the summary, this page is the receipt. Sourced from kestrel; supersedes-history not yet shown. Back to Research · Q1.