The Projection — a symmetric watercolor butterfly

The Projection

The surface is never the system.

← Research · Q1

Flex → EPC Power

$4.4B — **Flex agreed to acquire EPC Power for $4.4 billion, adding EPC's 800-volt data-center power architectures — digital rectifiers and solid-state transformers — plus grid-forming technology for storage and microgrids to Flex's Cloud and Power Infrastructure segment, which Flex plan

high confidence · as of 2026-09-03T00:00:00Z · about Epc power

$4.4B — **Flex agreed to acquire EPC Power for $4.4 billion, adding EPC's 800-volt data-center power architectures — digital rectifiers and solid-state transformers — plus grid-forming technology for storage and microgrids to Flex's Cloud and Power Infrastructure segment, which Flex plan

Sourced figures 2


the working

Basis

$4.4B — **Flex agreed to acquire EPC Power for $4.4 billion, adding EPC's 800-volt data-center power architectures — digital rectifiers and solid-state transformers — plus grid-forming technology for storage and microgrids to Flex's Cloud and Power Infrastructure segment, which Flex plan

Threads 0

No thread tagged to this actor yet.

A claim is one metric we assert about a node — the value is the summary, this page is the receipt. Sourced from kestrel; supersedes-history not yet shown. Back to Research · Q1.