ASE Technology (advanced packaging/test capacity construction (LEAP program)) → Hung Ching Construction hypothesis — not confirmed

$163.4M — Hung Ching Construction sold ASE the existing K18 facility for approximately NT$5.26B (~$163.4M); Hung Ching also holds a 77.76% stake in the K28 plant joint venture versus ASE's 22.24% (ASE contributed the land, Hung Ching funds the construction).

high confidence · about Hung ching construction

$163.4M — Hung Ching Construction sold ASE the existing K18 facility for approximately NT$5.26B (~$163.4M); Hung Ching also holds a 77.76% stake in the K28 plant joint venture versus ASE's 22.24% (ASE contributed the land, Hung Ching funds the construction).

Sourced figures 1


the working

Basis

$163.4M — Hung Ching Construction sold ASE the existing K18 facility for approximately NT$5.26B (~$163.4M); Hung Ching also holds a 77.76% stake in the K28 plant joint venture versus ASE's 22.24% (ASE contributed the land, Hung Ching funds the construction).

This is a hypothesized partial answer to ASE Technology → unnamed vendor(s) — compute silicon & systems (advanced packaging/test capacity construction (LEAP program)) — not a confirmed decomposition of its figure, and not counted toward any total.

Threads 0

No thread tagged to this actor yet.

A claim is one metric we assert about a node — the value is the summary, this page is the receipt. Sourced from kestrel; supersedes-history not yet shown. Back to Research · Q1.