Hired as general contractor for Micron's Boise, Idaho fab after the 2022 announcement; Micron terminated Exyte's GC contract effective Sept 2, 2025 (per an Idaho Department of Labor filing), retaining Exyte afterward only as lead architect/engineer for Phase 1 design.
Hired as general contractor for Micron's Boise, Idaho fab after the 2022 announcement; Micron terminated Exyte's GC contract effective Sept 2, 2025 (per an Idaho Department of Labor filing), retaining Exyte afterward only as lead architect/engineer for Phase 1 design.
Sourced figures 1
the working
Basis
Hired as general contractor for Micron's Boise, Idaho fab after the 2022 announcement; Micron terminated Exyte's GC contract effective Sept 2, 2025 (per an Idaho Department of Labor filing), retaining Exyte afterward only as lead architect/engineer for Phase 1 design.
This is a hypothesized partial answer to Micron Technology → unnamed vendor(s) — memory & storage (memory fab construction (leading-edge DRAM)) — not a confirmed decomposition of its figure, and not counted toward any total.
Threads 0
No thread tagged to this actor yet.
A claim is one metric we assert about a node — the value is the summary, this page is the receipt. Sourced from kestrel; supersedes-history not yet shown. Back to Research · Q1.