$300.0M — Selected to design, build, and operate industrial water supply and reclamation infrastructure (Sandow Water Project, Blue Sky Water Reclamation Facility) for the Taylor site; $300M initial equity investment by EPCOR.
$300.0M — Selected to design, build, and operate industrial water supply and reclamation infrastructure (Sandow Water Project, Blue Sky Water Reclamation Facility) for the Taylor site; $300M initial equity investment by EPCOR.
Sourced figures 1
the working
Basis
$300.0M — Selected to design, build, and operate industrial water supply and reclamation infrastructure (Sandow Water Project, Blue Sky Water Reclamation Facility) for the Taylor site; $300M initial equity investment by EPCOR.
This is a hypothesized partial answer to Samsung Electronics → unnamed vendor(s) — land, shell & materials (foundry construction (fab capex)) — not a confirmed decomposition of its figure, and not counted toward any total.
Threads 0
No thread tagged to this actor yet.
A claim is one metric we assert about a node — the value is the summary, this page is the receipt. Sourced from kestrel; supersedes-history not yet shown. Back to Research · Q1.
