Samsung Electronics (foundry construction (fab capex)) → EPCOR Utilities hypothesis — not confirmed

$300.0M — Selected to design, build, and operate industrial water supply and reclamation infrastructure (Sandow Water Project, Blue Sky Water Reclamation Facility) for the Taylor site; $300M initial equity investment by EPCOR.

high confidence · about Epcor utilities

$300.0M — Selected to design, build, and operate industrial water supply and reclamation infrastructure (Sandow Water Project, Blue Sky Water Reclamation Facility) for the Taylor site; $300M initial equity investment by EPCOR.

Sourced figures 1


the working

Basis

$300.0M — Selected to design, build, and operate industrial water supply and reclamation infrastructure (Sandow Water Project, Blue Sky Water Reclamation Facility) for the Taylor site; $300M initial equity investment by EPCOR.

This is a hypothesized partial answer to Samsung Electronics → unnamed vendor(s) — land, shell & materials (foundry construction (fab capex)) — not a confirmed decomposition of its figure, and not counted toward any total.

Threads 0

No thread tagged to this actor yet.

A claim is one metric we assert about a node — the value is the summary, this page is the receipt. Sourced from kestrel; supersedes-history not yet shown. Back to Research · Q1.