SK hynix (memory fab construction (DRAM/HBM)) → Techcross Water & Energy hypothesis — not confirmed

$35.0M (estimate) — Letter of intent worth approximately 50 billion won (~$35M) for Phase 2 wastewater-treatment EPC work at the Yongin fab -- an LOI, not yet a signed contract.

high confidence · about Techcross water energy

$35.0M (estimate) — Letter of intent worth approximately 50 billion won (~$35M) for Phase 2 wastewater-treatment EPC work at the Yongin fab -- an LOI, not yet a signed contract.

Sourced figures 1


the working

Basis

$35.0M (estimate) — Letter of intent worth approximately 50 billion won (~$35M) for Phase 2 wastewater-treatment EPC work at the Yongin fab -- an LOI, not yet a signed contract.

This is a hypothesized partial answer to SK hynix → unnamed vendor(s) — memory & storage (memory fab construction (DRAM/HBM)) — not a confirmed decomposition of its figure, and not counted toward any total.