$35.0M (estimate) — Letter of intent worth approximately 50 billion won (~$35M) for Phase 2 wastewater-treatment EPC work at the Yongin fab -- an LOI, not yet a signed contract.
$35.0M (estimate) — Letter of intent worth approximately 50 billion won (~$35M) for Phase 2 wastewater-treatment EPC work at the Yongin fab -- an LOI, not yet a signed contract.
Sourced figures 1
the working
Basis
$35.0M (estimate) — Letter of intent worth approximately 50 billion won (~$35M) for Phase 2 wastewater-treatment EPC work at the Yongin fab -- an LOI, not yet a signed contract.
This is a hypothesized partial answer to SK hynix → unnamed vendor(s) — memory & storage (memory fab construction (DRAM/HBM)) — not a confirmed decomposition of its figure, and not counted toward any total.