$18.7M — Confirmed KRW 25.25B (~$18.7M) contract, signed June 26 2026, to supply/install the Central Chemical Supply System (CCSS) for the Yongin fab.
$18.7M — Confirmed KRW 25.25B (~$18.7M) contract, signed June 26 2026, to supply/install the Central Chemical Supply System (CCSS) for the Yongin fab.
Sourced figures 1
the working
Basis
$18.7M — Confirmed KRW 25.25B (~$18.7M) contract, signed June 26 2026, to supply/install the Central Chemical Supply System (CCSS) for the Yongin fab.
This is a hypothesized partial answer to SK hynix → unnamed vendor(s) — memory & storage (memory fab construction (DRAM/HBM)) — not a confirmed decomposition of its figure, and not counted toward any total.
Threads 0
No thread tagged to this actor yet.
A claim is one metric we assert about a node — the value is the summary, this page is the receipt. Sourced from kestrel; supersedes-history not yet shown. Back to Research · Q1.