TSMC (foundry construction (fab capex)) → Yates Construction
hypothesis — not confirmed
General contractor on TSMC's Arizona Fab 21 (broke ground 2022, targeted 2024 completion).
General contractor on TSMC's Arizona Fab 21 (broke ground 2022, targeted 2024 completion).
Sourced figures 1
the working
Basis
General contractor on TSMC's Arizona Fab 21 (broke ground 2022, targeted 2024 completion).
This is a hypothesized partial answer to TSMC → unnamed vendor(s) — land, shell & materials (foundry construction (fab capex)) — not a confirmed decomposition of its figure, and not counted toward any total.
Threads 0
No thread tagged to this actor yet.
A claim is one metric we assert about a node — the value is the summary, this page is the receipt. Sourced from kestrel; supersedes-history not yet shown. Back to Research · Q1.