$375.0M — Foxconn sold its 6.2M sq ft former Lordstown Assembly plant to a SoftBank-affiliated buyer ('Crescent Dune LLC') for $375M, then leases it back to manufacture Stargate data center equipment; Shimizu North America LLC is the contractor starting construction there.
$375.0M — Foxconn sold its 6.2M sq ft former Lordstown Assembly plant to a SoftBank-affiliated buyer ('Crescent Dune LLC') for $375M, then leases it back to manufacture Stargate data center equipment; Shimizu North America LLC is the contractor starting construction there.
Sourced figures 1
the working
Basis
$375.0M — Foxconn sold its 6.2M sq ft former Lordstown Assembly plant to a SoftBank-affiliated buyer ('Crescent Dune LLC') for $375M, then leases it back to manufacture Stargate data center equipment; Shimizu North America LLC is the contractor starting construction there.
This is a hypothesized partial answer to Stargate LLC (joint venture) (infrastructure joint-venture equity formation, 2025-01-21) → Stargate — not a confirmed decomposition of its figure, and not counted toward any total.
Threads 0
No thread tagged to this actor yet.
A claim is one metric we assert about a node — the value is the summary, this page is the receipt. Sourced from kestrel; supersedes-history not yet shown. Back to Research · Q1.