The Projection — a symmetric watercolor butterfly

The Projection

The surface is never the system.

AI

Camellia

OpenAI-direct build (Octans GA LLC/Butler Snow — no named GC or Stargate-JV backer): Savannah Gateway Industrial Hub, Rincon, Effingham County GA; 3.2GW/25yr Georgia Power PPA phased 2028-2032; $20-30B cost unreconciled across outlets; pre-construction, DRI filed 07-24, Coastal Regional Commission review (≤30d) pending. DISTINCT from SoftBank's ~10GW Ohio (Portsmouth) campus. Track: the local secrecy backlash (10K+ petition), generation-mix disclosure, and whether a GC/financing partner surfaces.

STATUS · OPEN OPENED · 2026-07-24 LAST SEEN · 2026-07-28
OpenAI

This week's evidence

Rincon met on "Camellia" in person — the local-opposition track on OpenAI's 3.2GW Georgia site went live (WTOC). 2026-07-28 · NEW

2026-07-28 — Rincon meets on the plan ⟨daily 2026-07-28⟩

2026-07-24 — Opened

← Backstory

Related threads (shared entities)

· GPT-5.6
· Jalapeño
· OpenAI IPO
· Microsoft's Hedge
· Circular Financing
· Stargate
· Frontier Gatekeeping
· Containment Breach
· Where the Capex Lands
· Compute Spend
· Datacenter Sites
· Nvidia's Order Book
· In-House Silicon
· Big Tech into Health
· OpenAI Health
· Lab IPO Wave
· Nvidia as Lender