The Projection — a symmetric watercolor butterfly

The Projection

The surface is never the system.

AI

Google Capex

$195-205B guided for 2026 (07-22), destination traced by crawl 07-27: a 15+ state land-grab (MO $15B, MI 1GW "Cannoli", TX 1GW+, NextEra 3×GW-scale) + India $15B hub — not a few megasites. TPU v7 "Ironwood" vs Nvidia split UNDISCLOSED (Anthropic's 1M-TPU deal is the clearest volume signal). Solar-dominant PPAs + first Gen-IV utility deal (TVA/Kairos, 2030). Payoff case ($514B backlog, Cloud +82%) is press-corroborated, primary filing unreached. Watch: Q3 guidance, the FCF-negative reaction, TPU externalization (Meta eval).

STATUS · DEVELOPING OPENED · 2026-07-23 LAST SEEN · 2026-07-27
Google

2026-07-23 — Thread opened; the full Q2 picture lands

← Backstory (crawl 2026-07-27 → artifacts/findings/google-capex-2026-07-27.md)

2026-07-22 — The raise

2026-07-20 — The question gets a date

2026-07-08 — Wyoming named as a Google site

2026-06-22 — Virginia’s $9B trio

2026-06-15 — Alabama expansion

2026-06-04 — The Texas Panhandle mega-complex

2026-05-20 — Missouri’s $15B

2026-04-28 — India’s gigawatt-scale AI Hub breaks ground

2026-04-06 — Anthropic doubles down on TPU capacity

2026-03-18 — Michigan’s “Project Cannoli”

2026-02-18 — Geothermal: Ormat, Nevada

2026-02-09 — Solar at gigawatt scale: TotalEnergies, Texas

2025-12-22 — Buying the developer: Intersect Power

2025-12-09 — NextEra: at least three gigawatt-scale campuses

2025-11-06 — The chip: TPU v7 “Ironwood” ships

2025-10-24 — The clearest TPU volume signal: Anthropic

2025-08-18 — Power comes online: the first US utility PPA for Gen-IV nuclear

Related threads (shared entities)

· Apple × Gemini
· Frontier Gatekeeping
· Hyperscaler Capex
· Where the Capex Lands
· Compute Spend
· In-House Silicon
· Big Tech into Health
· Google Health